Hey Empire, The Following updates are coming soon to Empire Venues:
- All Door of Venue will Receive a Redesign
- The Rigging System will be removed
- The Video Wall will be removed and changed to a projector-based screen
-
Lighting Rig will be extended
- This will be started once the Tech Booth is completed
- All Tech including Sound System will be moved into tech booth.
- Safety Lights will receive a model and update.
- Catwalk Work-Lights will be Finished
- Catwalk Blue-Light System Being Finished
- Blackbox Lighting Update
- Staff Room Updated & Shrunk
- Lobby Update for Christmas
-
Possible More Seating Added Under Balcony.
- Unsure how it will work
- Color Changing Outside and Window Lighting
- Shrinking of MP Room 2 to allow for the addition of closet / Electrical Room
- Shrinking of Merch Shop for Bathroom Addition
- Add Accent Lighting to Walls of MP Room 2
- Add Perm Lighting Rig to MP Room 1
- Update Conference Room
-
Update / Add New Loading Screen
- Might Not Occur
- Build Green Room Attached to Main Hallway.
- Update Back-Stage / Loading Dock Area
- Update Stage Door Area
-
Add Car Outlines (Low Poly) To the Parking lot
- Might Not Occur
- Create a Front Entrance sign for the driveway.