Hey Empire, The Following updates are coming soon to Empire Venues:

  • All Door of Venue will Receive a Redesign
  • The Rigging System will be removed
  • The Video Wall will be removed and changed to a projector-based screen
  • Lighting Rig will be extended
    • This will be started once the Tech Booth is completed
    • All Tech including Sound System will be moved into tech booth.
  • Safety Lights will receive a model and update.
  • Catwalk Work-Lights will be Finished
  • Catwalk Blue-Light System Being Finished
  • Blackbox Lighting Update
  • Staff Room Updated & Shrunk
  • Lobby Update for Christmas
  • Possible More Seating Added Under Balcony.
    • Unsure how it will work
  • Color Changing Outside and Window Lighting
  • Shrinking of MP Room 2 to allow for the addition of closet / Electrical Room
  • Shrinking of Merch Shop for Bathroom Addition
  • Add Accent Lighting to Walls of MP Room 2
  • Add Perm Lighting Rig to MP Room 1
  • Update Conference Room
  • Update / Add New Loading Screen
    • Might Not Occur
  • Build Green Room Attached to Main Hallway.
  • Update Back-Stage / Loading Dock Area
  • Update Stage Door Area
  • Add Car Outlines (Low Poly) To the Parking lot
    • Might Not Occur
  • Create a Front Entrance sign for the driveway.